Energy Intelligence

Data Center Power Sources

How AI infrastructure is powered — coal, gas, nuclear, hydro, wind, solar
Mixed (Gas + Renewables)
55
projects
55.1 GW
🌿
Mixed Renewables (Wind/Solar/Hydro)
37
projects
31.2 GW
💨
Wind
18
projects
7.5 GW
💧
Hydropower
18
projects
11.4 GW
Coal
15
projects
10.4 GW
🔥
Natural Gas
14
projects
31.5 GW
☀️
Solar
5
projects
730 MW
☢️
Nuclear
4
projects
13.2 GW
Unknown / Not Disclosed
1
projects
2.5 GW

All Projects — by Power Source

  • Mixed (Gas + Renewables)
  • Mixed Renewables (Wind/Solar/Hydro)
  • Wind
  • Hydropower
  • Coal
  • Natural Gas
  • Solar
  • Nuclear
  • Unknown / Not Disclosed

🇺🇸 US vs 🇨🇳 China — Power Source Comparison

09182736Mixed (Gas +Renewables)Mixed Renewables(Wind/Solar/Hydro)WindHydropowerCoalNatural GasSolarNuclearUnknown / NotDisclosed
  • US
  • China

⚡ Key Energy Insights

🇺🇸 United States
  • Natural gas dominates the South and Gulf Coast (Texas, Louisiana, Mississippi), powering hyperscale campuses like Meta Hyperion, xAI Colossus, and Amazon's Mississippi facilities.
  • Nuclear revival is a defining trend: Microsoft's Three Mile Island restart, Amazon's Salem Twp campus near Susquehanna nuclear, and Fermi America's 9 GW SMR campus in the Texas Panhandle.
  • Hydropower drives the Pacific Northwest (Quincy WA, Oregon's Columbia River corridor) — the cheapest power in the US at ~$0.02/kWh.
  • Wind powers Iowa (Apple, Google, Meta), Nebraska, Wyoming, and Texas coastal campuses like IREN Childress.
  • Most hyperscalers commit to 100% renewable matching via PPAs, though actual grid power often includes gas.
🇨🇳 China
  • Coal still powers most eastern hubs (Beijing, Tianjin, Shandong, Henan, Liaoning) — China's grid remains ~60% coal-fired.
  • The Eastern Data, Western Compute (EDWC) initiative explicitly moves AI training to western provinces with cheap renewables: Inner Mongolia (wind), Xinjiang (solar), Qinghai/Sichuan/Guizhou/Guangxi (hydro).
  • Hydropower is the dominant clean source — Sichuan, Yunnan, Guizhou, Guangxi, and Chongqing all leverage massive Yangtze River tributaries.
  • Wind + solar power the EDWC western nodes: Inner Mongolia, Xinjiang, Gansu, Ningxia, and Zhangjiakou (which also supplies green power to Beijing via EDWC corridors).
  • China is building nuclear-powered data centers as part of its 2060 carbon neutrality goal, though none are yet operational for this purpose.

All Projects — Power Source Reference

ProjectCountryPower SourceMWDeveloperSource
Northern Virginia / Ashburn (Data Center Alley)🇺🇸 US⚡ Mixed (Gas + Renewables)3.5 GWAWSCBRE North America Data Center Trends H2 2025; JLL Data Center Outlook 2025
Prince William County DC Campus🇺🇸 US⚡ Mixed (Gas + Renewables)2.0 GWQTSData Center Knowledge, Apr 2026; CBRE H2 2025
Fredericksburg / Stafford County🇺🇸 US⚡ Mixed (Gas + Renewables)500 MWAWSData Center Knowledge, Apr 2026
Richmond County, VA🇺🇸 US⚡ Mixed (Gas + Renewables)432 MWMultiple developersCBRE North America Data Center Trends H2 2025
Dallas-Fort Worth Metro🇺🇸 US⚡ Mixed (Gas + Renewables)4.0 GWCyrusOneCBRE H2 2025; JLL 2025; electricchoice.com Data Center Power Report 2025
Austin Metro🇺🇸 US⚡ Mixed (Gas + Renewables)2.5 GWGoogleCBRE H2 2025; electricchoice.com 2025
San Antonio🇺🇸 US⚡ Mixed (Gas + Renewables)1.2 GWQTSCBRE H2 2025
Abilene (Stargate / Crusoe)🇺🇸 US🔥 Natural Gas1.1 GWCrusoe Energy / OpenAI-Oracle StargateData Center Knowledge Apr 2026; electricchoice.com 2025; OpenAI Stargate announcement Jan 2025
El Paso (Meta)🇺🇸 US🌿 Mixed Renewables (Wind/Solar/Hydro)1.0 GWMeta PlatformsKTSM News Feb 2026; NM Borderplex Alliance; electricchoice.com 2025
Santa Teresa, NM (Project Jupiter — Oracle/OpenAI)🇺🇸 US🔥 Natural Gas1.2 GWBorderPlex Digital Assets / STACK Infrastructure (for Oracle & OpenAI)El Paso Matters Aug 27 2025; Construction Reporter Sep 22 2025; KFOX TV Mar 2026; projectjupitertogether.com
El Paso (Carlyle / Fort Bliss)🇺🇸 US❓ Unknown / Not Disclosed2.5 GWCarlyle Groupelectricchoice.com Data Center Power Report 2025
Pecos / Reeves County (Microsoft)🇺🇸 US🌿 Mixed Renewables (Wind/Solar/Hydro)2.6 GWMicrosoftelectricchoice.com 2025; BlackRidge Research Top 15 Upcoming US Data Centers
GW Ranch (Pacifico Energy)🇺🇸 US🔥 Natural Gas7.7 GWPacifico Energyelectricchoice.com 2025; BlackRidge Research
Vantage Frontier (Shackelford County)🇺🇸 US⚡ Mixed (Gas + Renewables)1.4 GWVantage Data CentersData Center Knowledge Apr 2026; electricchoice.com 2025
Wilbarger County (Google)🇺🇸 US🌿 Mixed Renewables (Wind/Solar/Hydro)800 MWGoogleelectricchoice.com 2025
West Texas (Google — 3 campuses)🇺🇸 US🌿 Mixed Renewables (Wind/Solar/Hydro)3.0 GWGoogleGoogle press release 2025; electricchoice.com 2025
Childress (IREN)🇺🇸 US💨 Wind750 MWIRENelectricchoice.com 2025; IREN investor reports 2025
Houston🇺🇸 US🔥 Natural Gas523 MWServerfarmCBRE H2 2025
South Dallas (GridFree AI)🇺🇸 US🔥 Natural Gas5.0 GWGridFree AIelectricchoice.com 2025
Nexus Hubbard (Hill County)🇺🇸 US🔥 Natural Gas7.2 GWNexus Data Centerselectricchoice.com 2025; BlackRidge Research
Tract Caldwell Valley🇺🇸 US⚡ Mixed (Gas + Renewables)4.0 GWTractelectricchoice.com 2025
Fermi Campus (Carson County)🇺🇸 US☢️ Nuclear9.0 GWFermi Americaelectricchoice.com 2025; BlackRidge Research Top 15
CyrusOne Whitney (Hill County)🇺🇸 US🔥 Natural Gas400 MWCyrusOneData Center Knowledge Apr 2026
Columbus / New Albany, OH🇺🇸 US⚡ Mixed (Gas + Renewables)2.0 GWGoogleCBRE H2 2025; JLL 2025
Johnstown, OH (Cologix)🇺🇸 US⚡ Mixed (Gas + Renewables)800 MWCologixData Center Knowledge Apr 2026
Sunbury, OH (Amazon)🇺🇸 US⚡ Mixed (Gas + Renewables)500 MWAmazon AWSelectricchoice.com 2025
Lebanon, IN (Meta)🇺🇸 US🌿 Mixed Renewables (Wind/Solar/Hydro)1.0 GWMeta PlatformsMeta press release Feb 2026; electricchoice.com 2025
Northern Indiana (Amazon)🇺🇸 US🌿 Mixed Renewables (Wind/Solar/Hydro)2.4 GWAmazon AWSelectricchoice.com 2025; BlackRidge Research
La Porte, IN (Microsoft)🇺🇸 US⚡ Mixed (Gas + Renewables)245 MWMicrosoftData Center Knowledge Apr 2026
Salem Twp & Fairless Hills, PA (Amazon)🇺🇸 US☢️ Nuclear2.0 GWAmazon AWSelectricchoice.com 2025; BlackRidge Research
Middlesex Twp, Cumberland Co, PA🇺🇸 US☢️ Nuclear1.4 GWPA Data Center Partnerselectricchoice.com 2025
Lancaster, PA (CoreWeave)🇺🇸 US⚡ Mixed (Gas + Renewables)600 MWCoreWeaveData Center Knowledge Apr 2026
Three Mile Island, PA (Microsoft)🇺🇸 US☢️ Nuclear835 MWMicrosoft / Constellation EnergyMicrosoft/Constellation Energy announcement Sep 2023; electricchoice.com 2025
Madison & Warren County, MS (Amazon)🇺🇸 US🔥 Natural Gas1.5 GWAmazon AWSelectricchoice.com 2025; BlackRidge Research
Meridian, MS (Compass)🇺🇸 US🔥 Natural Gas500 MWCompass Datacenterselectricchoice.com 2025
Southaven, MS (xAI MACROHARD)🇺🇸 US🔥 Natural Gas2.0 GWxAI (Elon Musk)electricchoice.com 2025; BlackRidge Research
Memphis, TN (xAI Colossus)🇺🇸 US🔥 Natural Gas200 MWxAI (Elon Musk)electricchoice.com 2025; xAI press releases 2024–2025
Richland Parish, LA (Meta Hyperion)🇺🇸 US🔥 Natural Gas2.0 GWMeta / Blue Owl Capitalelectricchoice.com 2025; BlackRidge Research; Meta press release 2025
West Feliciana Parish, LA (Hut 8 / Google)🇺🇸 US🔥 Natural Gas1.0 GWHut 8 / Google (Fluidstack)electricchoice.com 2025
Caddo & Bossier Parishes, LA (Amazon)🇺🇸 US🔥 Natural Gas1.2 GWAmazon AWSelectricchoice.com 2025; BlackRidge Research
Atlanta Metro (Douglasville / Palmetto)🇺🇸 US⚡ Mixed (Gas + Renewables)3.0 GWSwitchCBRE H2 2025; JLL 2025
Richmond County, NC (Amazon)🇺🇸 US🌿 Mixed Renewables (Wind/Solar/Hydro)1.0 GWAmazon AWSelectricchoice.com 2025
Research Triangle / Charlotte, NC🇺🇸 US🌿 Mixed Renewables (Wind/Solar/Hydro)1.5 GWAppleCBRE H2 2025
Aiken County, SC (Meta)🇺🇸 US🌿 Mixed Renewables (Wind/Solar/Hydro)715 MWMeta PlatformsMeta press release 2025; electricchoice.com 2025
Mount Pleasant / Racine County, WI (Microsoft)🇺🇸 US🌿 Mixed Renewables (Wind/Solar/Hydro)1.0 GWMicrosoftelectricchoice.com 2025; BlackRidge Research
Port Washington, WI (Vantage / Oracle Stargate)🇺🇸 US⚡ Mixed (Gas + Renewables)902 MWVantage Data Centers (for Oracle/OpenAI Stargate)electricchoice.com 2025; BlackRidge Research
Berkeley County, WV (Penzance)🇺🇸 US⚡ Mixed (Gas + Renewables)600 MWPenzance Managementelectricchoice.com 2025
West Memphis, AR (Google)🇺🇸 US🌿 Mixed Renewables (Wind/Solar/Hydro)1.0 GWGoogleelectricchoice.com 2025
Phoenix Metro (Mesa / Goodyear / Chandler)🇺🇸 US🌿 Mixed Renewables (Wind/Solar/Hydro)3.5 GWMicrosoftCBRE H2 2025; JLL 2025
Silicon Valley (Santa Clara)🇺🇸 US🌿 Mixed Renewables (Wind/Solar/Hydro)2.0 GWEquinixCBRE H2 2025
Los Angeles Metro🇺🇸 US🌿 Mixed Renewables (Wind/Solar/Hydro)800 MWEquinixCBRE H2 2025
Chicago (Elk Grove Village / Aurora)🇺🇸 US⚡ Mixed (Gas + Renewables)2.5 GWMicrosoftCBRE H2 2025; JLL 2025
Hillsboro / Prineville / The Dalles, OR🇺🇸 US💧 Hydropower2.0 GWAppleCBRE H2 2025
Quincy / Moses Lake, WA🇺🇸 US💧 Hydropower1.5 GWMicrosoftCBRE H2 2025
Des Moines / Altoona, IA🇺🇸 US💨 Wind1.2 GWAppleCBRE H2 2025
Las Vegas / Henderson, NV🇺🇸 US🌿 Mixed Renewables (Wind/Solar/Hydro)1.5 GWSwitch (SUPERNAP)CBRE H2 2025
Omaha / Lincoln, NE🇺🇸 US💨 Wind600 MWGoogleCBRE H2 2025
Salt Lake City / Bluffdale, UT🇺🇸 US⚡ Mixed (Gas + Renewables)800 MWMetaCBRE H2 2025
Los Lunas, NM (Meta)🇺🇸 US🌿 Mixed Renewables (Wind/Solar/Hydro)600 MWMeta Platformselectricchoice.com 2025
Kansas City, MO (Google)🇺🇸 US🌿 Mixed Renewables (Wind/Solar/Hydro)400 MWGoogleelectricchoice.com 2025
Cheyenne, WY (Microsoft)🇺🇸 US💨 Wind300 MWMicrosoftelectricchoice.com 2025
Miami / Tampa / Jacksonville, FL🇺🇸 US⚡ Mixed (Gas + Renewables)1.2 GWEquinixCBRE H2 2025
NYC Metro (Secaucus / Piscataway)🇺🇸 US⚡ Mixed (Gas + Renewables)1.5 GWEquinixCBRE H2 2025
Beijing-Tianjin-Hebei Hub🇨🇳 China⚫ Coal4.0 GWAlibabaOxford Energy Institute, Feb 2026; Goldman Sachs China AI Data Centers Report 2025
Zhangjiakou (EDWC Western Node)🇨🇳 China🌿 Mixed Renewables (Wind/Solar/Hydro)1.5 GWAlibabaOxford Energy Institute Feb 2026; Sinocities Substack EDWC Analysis 2025
Shanghai / Yangtze River Delta Hub🇨🇳 China⚡ Mixed (Gas + Renewables)5.0 GWAlibabaOxford Energy Institute Feb 2026; Cushman & Wakefield Greater China Data Centers 2024
Guangdong / Greater Bay Area Hub🇨🇳 China⚡ Mixed (Gas + Renewables)4.5 GWAlibabaOxford Energy Institute Feb 2026; CNBC Apr 2026
Shaoguan, Guangdong (Alibaba / China Telecom)🇨🇳 China⚡ Mixed (Gas + Renewables)500 MWAlibaba + China TelecomCNBC Apr 8 2026; Alibaba Cloud press release Apr 2026
Chengdu-Chongqing Hub🇨🇳 China💧 Hydropower2.5 GWAlibabaOxford Energy Institute Feb 2026; Goldman Sachs 2025
Inner Mongolia Hub (Hohhot / Ulanqab)🇨🇳 China⚫ Coal3.0 GWChina TelecomOxford Energy Institute Feb 2026; MIT Technology Review Mar 2026; Zhihu DC Tracker Q1 2025
Datong, Shanxi (ByteDance)🇨🇳 China⚫ Coal400 MWByteDanceJon Peddie Research 2025; Zhihu DC Tracker Q1 2025
Guizhou Hub (Guiyang / Gui'an)🇨🇳 China💧 Hydropower2.0 GWApple (iCloud)Oxford Energy Institute Feb 2026; Sinocities Substack 2025
Gansu Hub (Qingyang / Lanzhou)🇨🇳 China💨 Wind1.2 GWChina UnicomOxford Energy Institute Feb 2026; Sinocities Substack 2025
Ningxia Hub (Zhongwei)🇨🇳 China🌿 Mixed Renewables (Wind/Solar/Hydro)1.5 GWChina TelecomOxford Energy Institute Feb 2026; Sinocities Substack 2025
Xinjiang Hub (Urumqi)🇨🇳 China⚫ Coal800 MWChina TelecomOxford Energy Institute Feb 2026; Zhihu DC Tracker 2025
Wuhan, Hubei🇨🇳 China⚡ Mixed (Gas + Renewables)1.0 GWTencentGoldman Sachs China AI Data Centers 2025; Zhihu DC Tracker 2025
Xi'an, Shaanxi🇨🇳 China⚡ Mixed (Gas + Renewables)800 MWHuaweiGoldman Sachs 2025; Zhihu DC Tracker 2025
Chongqing (standalone)🇨🇳 China💧 Hydropower1.2 GWAlibabaOxford Energy Institute Feb 2026
Hangzhou, Zhejiang (Alibaba HQ)🇨🇳 China⚡ Mixed (Gas + Renewables)2.0 GWAlibaba Cloud (HQ)Cushman & Wakefield Greater China 2024; Goldman Sachs 2025
Nanjing, Jiangsu🇨🇳 China⚡ Mixed (Gas + Renewables)1.5 GWTencentCushman & Wakefield Greater China 2024
Shenzhen, Guangdong🇨🇳 China⚡ Mixed (Gas + Renewables)2.0 GWTencent (HQ)Cushman & Wakefield Greater China 2024; Goldman Sachs 2025
Tianjin Binhai🇨🇳 China⚫ Coal1.0 GWChina TelecomOxford Energy Institute Feb 2026
Qinghai (Xining) — Clean Energy Hub🇨🇳 China🌿 Mixed Renewables (Wind/Solar/Hydro)600 MWChina TelecomOxford Energy Institute Feb 2026; Sinocities Substack 2025
Tibet Plateau (Lhasa) — AI Data Center🇨🇳 China💧 Hydropower200 MWState-owned enterprisesXinhua News Jan 2026; Jon Peddie Research 2025
Sichuan (Leshan / Yibin) — Hydro Hub🇨🇳 China💧 Hydropower800 MWAlibabaOxford Energy Institute Feb 2026; Goldman Sachs 2025
Hainan Free Trade Port🇨🇳 China🌿 Mixed Renewables (Wind/Solar/Hydro)500 MWAlibabaGoldman Sachs 2025; Zhihu DC Tracker 2025
Ulanqab (21Vianet Zero-Carbon AI Campus)🇨🇳 China🌿 Mixed Renewables (Wind/Solar/Hydro)600 MW21Vianet (世纪互联)Zhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Hohhot Helingeer (ByteDance Volcano Engine)🇨🇳 China💨 Wind800 MWByteDance / Volcano EngineZhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Hohhot Helingeer (China Bank / Pufa Bank)🇨🇳 China💨 Wind200 MWBank of China + Shanghai Pudong Development BankZhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Hohhot Helingeer (Dongfang Guoxin)🇨🇳 China💨 Wind1.0 GWDongfang Guoxin (东方国信)Zhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Hohhot Helingeer (Jingmeng AI Center)🇨🇳 China💨 Wind200 MWInner Mongolia Jingmeng Zhisuan TechZhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Ordos Dalat Banner (Shengda Data Analytics)🇨🇳 China⚫ Coal40 MWDalat Banner Shengda Data AnalyticsZhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Tongliao (Guochan Qian P Computing Pool)🇨🇳 China💨 Wind100 MWInner Mongolia Gaoshu Big DataZhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Chifeng (Supercomputing Center Phases 1–3)🇨🇳 China💨 Wind300 MWInner Mongolia Supercomputing Data TechZhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Ulanqab (UCloud Data Center)🇨🇳 China🌿 Mixed Renewables (Wind/Solar/Hydro)100 MWUCloud (优刻得)Zhihu DC Tracker 2025 H1 (zhuanlan.zhihu.com/p/1927072193038227274)
Xinxing City (Guoxin Qingkong 30,000P)🇨🇳 China☀️ Solar300 MWGuoxin Qingkong (国信清控)Zhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Hami (AI Computing Centers)🇨🇳 China☀️ Solar200 MWFuyu Zhineng / Fuyu ZhisuanZhihu DC Tracker 2025 H1 (zhuanlan.zhihu.com/p/1927072193038227274)
Yupuhu County (8,000P Domestic Chip Center)🇨🇳 China☀️ Solar80 MWLocal government + SOEZhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Aletai (Green Low-Carbon AI Center)🇨🇳 China🌿 Mixed Renewables (Wind/Solar/Hydro)100 MWLocal SOEZhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Yechen County (Kunlun Cloud 10,000P)🇨🇳 China☀️ Solar100 MWKunlun CloudZhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Hetian (Zhichuang AI Center)🇨🇳 China☀️ Solar50 MWXinjiang Zhichuang Intelligent TechZhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Karamay (AI Computing Base)🇨🇳 China⚡ Mixed (Gas + Renewables)100 MWKaramay Cloud Computing Industrial ParkZhihu DC Tracker 2025 H1 (zhuanlan.zhihu.com/p/1927072193038227274)
Zhuozhou, Hebei (Alibaba Cloud)🇨🇳 China⚡ Mixed (Gas + Renewables)500 MWAlibaba CloudZhihu DC Tracker 2025 H1 (zhuanlan.zhihu.com/p/1927072193038227274)
Langfang, Hebei (Yunfeng DC Phase 3)🇨🇳 China⚫ Coal200 MWLangfang Yunfeng Data CenterZhihu DC Tracker 2025 H1 (zhuanlan.zhihu.com/p/1927072193038227274)
Xiongan New Area (Urban Computing Center)🇨🇳 China🌿 Mixed Renewables (Wind/Solar/Hydro)300 MWState Grid + SOEsXinhua News Jan 2026; Zhihu DC Tracker 2025
Zhangjiakou (Zhongke Hongxin AI Park)🇨🇳 China💨 Wind200 MWZhongke HongxinZhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Laishui, Hebei (Tsinghua Network Tech Park)🇨🇳 China⚡ Mixed (Gas + Renewables)100 MWTsinghua Network TechZhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Guangzhou Huangpu (4 New AI Centers)🇨🇳 China⚡ Mixed (Gas + Renewables)400 MWChina Mobile GBAGuangzhou Municipal Government announcement Apr 2026 (gz.gov.cn/ysgz/xwdt/ysdt)
Shaoguan (Tencent Zhenjiang Phase 2)🇨🇳 China⚡ Mixed (Gas + Renewables)200 MWTencentZhihu DC Tracker 2025 H1 (zhuanlan.zhihu.com/p/1927072193038227274)
Maoming (China Unicom 5G Edge)🇨🇳 China⚡ Mixed (Gas + Renewables)50 MWChina UnicomZhihu DC Tracker 2025 H1 (zhuanlan.zhihu.com/p/1927072193038227274)
Yangjiang (Green AI Center / GBA Power Fusion)🇨🇳 China💨 Wind200 MWCCCC Third Harbor EngineeringZhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Fuzhou (China Unicom Cloud DC3)🇨🇳 China⚡ Mixed (Gas + Renewables)100 MWChina Unicom FujianZhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Zhangzhou (Marine Big Data Center)🇨🇳 China⚡ Mixed (Gas + Renewables)100 MWLocal governmentZhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Putian Xianyou (Zerun AI Park Phase 1)🇨🇳 China🌿 Mixed Renewables (Wind/Solar/Hydro)200 MWPutian Huize Kang Cloud ComputingZhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Pingtan (Cross-Strait AI Center)🇨🇳 China🌿 Mixed Renewables (Wind/Solar/Hydro)100 MWPingtan Comprehensive Experimental ZoneZhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Jinan (AI Fusion Computing Center)🇨🇳 China⚫ Coal100 MWChina Telecom JinanZhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Qingdao (Super Computing Center)🇨🇳 China⚡ Mixed (Gas + Renewables)100 MWQingdao Municipal GovernmentZhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Weifang Binhai (Computing Industrial Park)🇨🇳 China💨 Wind100 MWWeifang Binhai DistrictZhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Weihai (Green Distributed AI Center)🇨🇳 China💨 Wind50 MWWeihai Zhiwang Hulian TechZhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Wuxi (China Telecom International DC Phase 3)🇨🇳 China⚡ Mixed (Gas + Renewables)100 MWChina Telecom WuxiZhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Suzhou Changshu (Wanguo Data AI Center)🇨🇳 China⚡ Mixed (Gas + Renewables)100 MWGDS (万国数据)Zhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Suzhou Zhangjigang (AI Computing Center)🇨🇳 China⚡ Mixed (Gas + Renewables)100 MWSuzhou Chongzhi Xin TechZhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Yancheng (SenseTime AI Center)🇨🇳 China⚡ Mixed (Gas + Renewables)100 MWSenseTime (商汤)Zhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Yancheng (Alibaba Cloud)🇨🇳 China⚡ Mixed (Gas + Renewables)100 MWAlibaba CloudZhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Yangzhou Yizheng (China Telecom Phase 3)🇨🇳 China⚡ Mixed (Gas + Renewables)200 MWChina TelecomZhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Suzhou Wujiang Fenhu (China Mobile Yangtze Delta)🇨🇳 China⚡ Mixed (Gas + Renewables)100 MWChina MobileZhihu DC Tracker 2025 H1 (zhuanlan.zhihu.com/p/1927072193038227274)
Wuhu (China Mobile Yangtze Delta Phase 2)🇨🇳 China⚡ Mixed (Gas + Renewables)100 MWChina Mobile AnhuiZhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Wuhu (China Telecom EDWC Phase 2)🇨🇳 China⚡ Mixed (Gas + Renewables)200 MWChina TelecomZhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Suzhou, Anhui (Baidu Cloud AI Center)🇨🇳 China⚡ Mixed (Gas + Renewables)100 MWBaidu CloudZhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Ma'anshan (Baoxin Software Big Data Park)🇨🇳 China⚡ Mixed (Gas + Renewables)50 MWBaoxin Software (Anhui)Zhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Zhengzhou Airport (AI Computing Cluster)🇨🇳 China⚫ Coal200 MWHenan Airport ZoneZhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Kaifeng (Green AI Computing Center)🇨🇳 China🌿 Mixed Renewables (Wind/Solar/Hydro)100 MWKaifeng Municipal GovernmentZhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Dengfeng (AI Computing Center)🇨🇳 China⚫ Coal100 MWDengfeng InvestmentZhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Huangshi (Advanced AI Center)🇨🇳 China⚡ Mixed (Gas + Renewables)50 MWHuangshi National Investment Digital Industry GroupZhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Zhuxian County (Guoxin No.1 AI Center)🇨🇳 China⚡ Mixed (Gas + Renewables)30 MWZhuxian County Digital Economy ParkZhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Hengyang (China Telecom AI Center)🇨🇳 China⚡ Mixed (Gas + Renewables)100 MWChina Telecom HengyangZhihu DC Tracker 2025 H1 (zhuanlan.zhihu.com/p/1927072193038227274)
Laibin Xingbin (Computing Cluster)🇨🇳 China💧 Hydropower200 MWLaibin Junhe Zhigu Digital Energy TechZhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Nanning (China-ASEAN AI Center)🇨🇳 China💧 Hydropower200 MWZhongda Shuzhi (Guangxi) TechZhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Baise (China-ASEAN AI Center)🇨🇳 China💧 Hydropower100 MWGuangxi Huahang RuntianZhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Xiangzhou County (Energy AI Center)🇨🇳 China💧 Hydropower100 MWXiangzhou CountyZhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Kunming (Guangnan Computing Center)🇨🇳 China💧 Hydropower50 MWYunnan Wenyou DevelopmentZhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Chuxiong (AI Center + Trusted Data Space)🇨🇳 China💧 Hydropower50 MWChuxiong State Capital Operations GroupZhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Liangshan Yi (Longteng AI Data Center)🇨🇳 China💧 Hydropower200 MWSichuan Yan Teng Data TechZhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Nanchong Gaoping (AI Center)🇨🇳 China💧 Hydropower50 MWNanchong Shujie Network TechZhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Tongren (China Telecom Cloud Data Center)🇨🇳 China💧 Hydropower50 MWChina Telecom TongrenZhihu DC Tracker 2025 H1 (zhuanlan.zhihu.com/p/1927072193038227274)
Qianjiang District (Data Lake Supercomputing)🇨🇳 China💧 Hydropower50 MWChongqing Xinyu Energy TechZhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Zhangye (Zhongshu Botong AI Center)🇨🇳 China💨 Wind100 MWZhongshu Botong (Zhangye)Zhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Lanzhou (Baidu Cloud Digital Economy Base)🇨🇳 China💨 Wind100 MWBaidu CloudZhihu DC Tracker 2025 H1 (zhuanlan.zhihu.com/p/1927072193038227274)
Huachi (Zhonghua Super Cloud AI Center)🇨🇳 China💨 Wind100 MWGansu Zhongte Cloud Data TechZhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Xining (Wanjie Jingfeng AI Center Phase 1)🇨🇳 China🌿 Mixed Renewables (Wind/Solar/Hydro)100 MWWanjie Jingfeng (Qinghai) AI TechZhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Xining (Yunhai Xingze AI Center Phase 1)🇨🇳 China🌿 Mixed Renewables (Wind/Solar/Hydro)100 MWQinghai Yunhai XingzeZhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Hainan Prefecture, Qinghai (AI Center)🇨🇳 China🌿 Mixed Renewables (Wind/Solar/Hydro)100 MWHainan Prefecture New Energy Zhisuan TechZhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Yinchuan (Smart City Big Data Center Phase 2)🇨🇳 China🌿 Mixed Renewables (Wind/Solar/Hydro)100 MWYinchuan Municipal GovernmentZhihu DC Tracker 2025 H1 (zhuanlan.zhihu.com/p/1927072193038227274)
Zhongwei (China Mobile NX Data Center D Zone)🇨🇳 China🌿 Mixed Renewables (Wind/Solar/Hydro)100 MWChina MobileZhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Xi'an (ICBC Data Center)🇨🇳 China⚡ Mixed (Gas + Renewables)200 MWICBC (Industrial and Commercial Bank of China)Zhihu DC Tracker 2025 H1 (zhuanlan.zhihu.com/p/1927072193038227274)
Shenyang (China Telecom AI Center)🇨🇳 China⚫ Coal100 MWChina Telecom LiaoningZhihu DC Tracker 2025 H1 (zhuanlan.zhihu.com/p/1927072193038227274)
Dengta (Liaoning 3,000P AI Center)🇨🇳 China⚫ Coal30 MWLiaoyang Jingxi Intelligent TechZhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Jilin City (Zhongke 10,000P Computing Center)🇨🇳 China⚡ Mixed (Gas + Renewables)100 MWJilin Longhe Energy-saving Environmental TechZhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Heihe, Heilongjiang (5,000P AI Center)🇨🇳 China⚫ Coal50 MWYunjing (Heilongjiang) Zhisuan TechZhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Tianjin Wuqing (China Unicom AI Center)🇨🇳 China⚫ Coal200 MWChina Unicom TianjinZhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Tianjin Baodi (Cloud Computing Base Phase 3)🇨🇳 China⚫ Coal200 MWTianjin Baodi Cloud ComputingZhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Beijing Tongzhou (AI Computing Center)🇨🇳 China⚡ Mixed (Gas + Renewables)200 MWBeijing Municipal GovernmentZhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Shanghai Lingang (Subsea Data Center Demo)🇨🇳 China🌿 Mixed Renewables (Wind/Solar/Hydro)30 MWHailan Cloud (Shanghai) Data TechZhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)
Chongqing (China Mobile Chengyu Phase 3)🇨🇳 China💧 Hydropower200 MWChina Mobile ChongqingZhihu DC Tracker 2025 H1 (zhuanlan.zhihu.com/p/1927072193038227274)
Sanya (China Telecom International Info Park)🇨🇳 China🌿 Mixed Renewables (Wind/Solar/Hydro)100 MWChina TelecomZhihu DC Tracker 2025 H1 (zhuanlan.zhihu.com/p/1927072193038227274)
Chengmai (Hainan AI Center)🇨🇳 China🌿 Mixed Renewables (Wind/Solar/Hydro)50 MWHainan ChengmaiZhihu DC Tracker 2025 H1 (zhuanlan.zhihu.com/p/1927072193038227274)
Wenchang (Aerospace Supercomputing Center)🇨🇳 China🌿 Mixed Renewables (Wind/Solar/Hydro)100 MWWenchang Aerospace Supercomputing Smart TechZhihu DC Tracker Q1 2025 (zhuanlan.zhihu.com/p/1890435067341431967)